15 research outputs found

    Covert Communication with Relay Selection

    Get PDF
    In this letter, we investigate covert communication in relay networks with relay selection. We consider the scenario that while forwarding the source’s message, the selected relay opportunistically transmits its own message to the destination covertly. We derive the probability of detection error (PDE) and the average covert rate (ACR) in a closed form, based on which we analyse the effects of system parameters on the performance of the covert communication. Our analysis indicates that applying relay selection causes a decrease in the PDE, however, it can provide an ACR gain when the transmission rate of the source increases

    Numerical Simulation of Multi-Crystalline Silicon Crystal Growth Using a Macro–Micro Coupled Method during the Directional Solidification Process

    No full text
    In this work, the crystal growth of multi-crystalline silicon (mc-Si) during the directional solidification process was studied using the cellular automaton method. The boundary heat transfer coefficient was adjusted to get a suitable temperature field and a high-quality mc-Si ingot. Under the conditions of top adiabatic and bottom constant heat flux, the shape of the crystal-melt interface changes from concave to convex with the decrease of the heat transfer coefficient on the side boundaries. In addition, the nuclei form at the bottom boundary while columnar crystals develop into silicon melt with amzigzag-faceted interface. The higher-energy silicon grains were merged into lower energy ones. In the end, the number of silicon grains decreases with the increase of crystal length

    A New Biomarkers Feature Pattern Consisting of TNF- α

    Get PDF
    Objective. To explore new diagnostic patterns for syndromes to overcome the insufficiency of obtainable macrocharacteristics and specific biomarkers. Methods. Chinese miniswines were subjected to Ameroid constrictor, placed around the proximal left anterior descending branch. On the 4th week, macrocharacteristics, coronary angiography, echocardiography, and hemorheology indices were detected for diagnosis. IL-1, IL-6, IL-8, IL-10, TNF-α, and hsCRP in serum were detected, and Decision Tree was built. Results. According to current official-issued standard, model animals matched the diagnosis of blood stasis syndrome with myocardial ischemia based on findings, including >90% occlusion, attenuated left ventricular segmental motion, dark red or purple tongues, and higher blood viscosity. Significant decrease of IL-10 and increase of TNF-α were found in model animals. However, in the Decision Tree, besides IL-10 and TNF-α, IL-8 helped to increase the accuracy of classification to 86%. Conclusions. The Decision Tree building with TNF-α, IL-10, and IL-8 is helpful for the diagnosis of blood stasis syndrome in myocardial ischemia animals. What is more is that our data set up a new path to the differentiation of syndrome by feature patterns consisting of multiple biomarkers not only for animals but also for patients. We believe that it will contribute to the standardization and international application of syndromes

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore